Tuesday, May 7, 2013

April 28th, 2013

Made progress over the weekend, and had one set back.

Progress: Took the flywheel to a machine shop to resurface it. Always a good idea, the flywheel was slightly warped. Looks much better now.

Image

Image

Installed the pilot bearing and the flywheel on Saturday.

Image

Installed the clutch and pressure plate today.

Image

I have to say, I like this much better than working on the A4LD.

The one setback of the weekend. The Clutch fork pivot bushing gave up the ghost when I removed the clutch fork.

Image

Should have this attached on the shaft.

Image

I pulled the piece out. I am hopeful I can find a suitable bushing to replace the one that failed.

Image

No comments:

Post a Comment